03 — Service
Interior Build
The build phase is where most interiors lose their intent. We hold the drawing, the programme and the finish standard together until the space is genuinely finished.
01 — What it covers
Everything in scope.
Fabrication, installation, finishes and disciplined on-site execution.
- Strip-out and making good
- Partitions, ceilings and bulkheads
- Joinery installation and second fix
- Wall finishes, paint and decorative surfaces
- Flooring supply and coordination
- Snagging and handover
02 — How it runs
Four steps, no surprises.
-
01
Pre-construction
Programme, method, access hours and a fixed schedule of finishes agreed before work starts.
-
02
Enabling works
Protection, strip-out and any structural or service alterations, sequenced to keep the site workable.
-
03
Installation
Joinery, finishes and fittings installed against the approved drawings, with weekly progress reporting.
-
04
Handover
A joint snag walk, an agreed defect list, and a documented close-out with warranties and care notes.
03 — Related work
Where this shows up.
04 — Questions
About interior build.
Can you work in an occupied home?
Do you take on the whole fit-out?
How do you handle variations?
Begin a project
Let’s create something
exceptional.
Tell us about the space, the constraint and your timing. One person reads every enquiry, and you will hear back from someone who would work on the project.