The build phase is where most interiors lose their intent. We hold the drawing, the programme and the finish standard together until the space is genuinely finished.

01 — What it covers

Everything in scope.

Fabrication, installation, finishes and disciplined on-site execution.

  • Strip-out and making good
  • Partitions, ceilings and bulkheads
  • Joinery installation and second fix
  • Wall finishes, paint and decorative surfaces
  • Flooring supply and coordination
  • Snagging and handover

02 — How it runs

Four steps, no surprises.

  1. 01

    Pre-construction

    Programme, method, access hours and a fixed schedule of finishes agreed before work starts.

  2. 02

    Enabling works

    Protection, strip-out and any structural or service alterations, sequenced to keep the site workable.

  3. 03

    Installation

    Joinery, finishes and fittings installed against the approved drawings, with weekly progress reporting.

  4. 04

    Handover

    A joint snag walk, an agreed defect list, and a documented close-out with warranties and care notes.

03 — Related work

Where this shows up.

All projects

04 — Questions

About interior build.

Can you work in an occupied home?
Yes. We phase the work, protect circulation routes and agree working hours in advance.
Do you take on the whole fit-out?
For interior scope, yes. Structural, MEP and external works we coordinate with the relevant specialists.
How do you handle variations?
Nothing is instructed without a written variation and a price. You approve the cost before the work happens.

Begin a project

Let’s create something
exceptional.

Tell us about the space, the constraint and your timing. One person reads every enquiry, and you will hear back from someone who would work on the project.